Pool Maintenance Tips

After A New Plaster Surface & Finish

A new pool finish will start to hydrate immediately after mixing, with the majority of hydration taking place within the first 28 days. This critical time period is when a finish is most susceptible to staining, scaling and discoloration. Proper startup procedures include timely brushing and constant monitoring as well as adjustment of the pool water.

The following recommended start-up method is based on procedures shown to produce the best aesthetic results. Due to unique local water conditions and environmental factors, parts of these recommended startup procedures may need to be modified to protect the pool finish. For example: filling the pool with extremely low calcium hardness, low pH or low total alkalinity levels may necessitate changes to these procedures.

Brushing and monitored chemical adjustments will be mandatory by the homeowner or a trained pool technician during the service life of any pool surface.

Pool Filling Day

  • Step 1: Make sure the filtration equipment is operational.
  • Step 2: Remove all floor return heads and directional eyeballs (if appropriate and recommended in your geographical area).
  • Step 3: Based on temperature and type of finish, fill the pool to the middle of the skimmer or specified water level without interruption as rapidly as possible with clean potable water to help prevent a bowl ring. Place a clean rag on the end of the hose, always placed in the deepest area, to prevent damage to the surface material. If a water truck is required, 24 inches (60 cm) of water should be placed at the deepest area for a water cushion. Wheeled devices should not be used in the pool until after 28 days.
  • Step 4: At no time should any person or pets be allowed in the pool during the fill. Do not allow any external sources of water to enter the pool to help prevent streaking. It is recommended that you do not swim in the pool until the water is properly balanced.
  • Step 5: Test fill water for pH, alkalinity, calcium hardness and metals. Record test results.
  • Step 6: Start the filtration system immediately when the pool is full to the middle of the skimmer or specified water level.

First Day

(It is vital to follow these steps in order – prior to proceeding to the next step)

  1. Step 1: Test pH, alkalinity, calcium hardness and metals. Record test results.
  2. Step 2: High alkalinity should be adjusted to 80 ppm (mg/L) using pre-diluted Muriatic Acid (31-33% Hydrochloric acid). Always pre-dilute the acid by adding it to a five gallon (19 liter) bucket of pool water.
  3. Step 3: Low alkalinity should be adjusted to 80 ppm (mg/L) using sodium bicarbonate (baking soda).
  4. Step 4: pH should be reduced to 7.2 to 7.6 adding pre-diluted Muriatic Acid if the alkalinity is already 80-100 ppm (mg/L).
  5. Step 5: Once the alkalinity is adjusted to 80 ppm (mg/L) and the pH is adjusted to 7.2 to 7.6, then adjust calcium hardness levels to a minimum of 150 ppm (mg/L).
  6. Step 6: Brush the entire pool surface thoroughly at least twice daily to remove all plaster dust.
  7. Step 7: Although optional, it is highly recommended to pre-dilute and add a quality sequestering agent using the recommended initial start-up dosage and then the recommended maintenance dosage per the sequestering agent’s manufacturer.
  8. Step 8: Operate filtration system continuously for a minimum of 72 hours.
  9. Step 9: DO NOT add chlorine for 48 hours. DO NOT turn on pool heater until there is no plaster dust in the pool.

 

Second Day

  1. Step 1: Test pH, Alkalinity and Calcium Hardness and repeat steps of 1st Day except for Step 6.

 

Third Day

  1. Step 1: Test pH, Alkalinity and Calcium Hardness and repeat 1st Day Steps 1 through 6.
  2. Step 2: Pre-diluted chlorine may now be added to achieve 1.5 to 3 ppm (mg/L). NO SALT SHOULD BE ADDED FOR 28 DAYS.
  3. Step 3: Brush the entire pool surface thoroughly at least twice daily to remove all plaster dust.

 

Fourth Through The 28th Day

  1. Step 1: Test pH, Carbonate Alkalinity and Calcium Hardness and repeat 1st Day Steps 1 through 5 every day for 14 days to help prevent the scaling of the pool surface.
  2. Step 2: On the 7th day, if there is any plaster dust remaining – remove it using a brush pool vacuum.
  3. Step 3: After the 4th Day – calcium levels should be adjusted slowly over the 28 day period not to exceed 200 ppm (mg/L).
  4. Step 4: After the 4th Day – adjust cyanuric acid levels to 30 to 50 ppm (mg/L) based on the primary sanitizer of the pool (pre-dissolve and add through the skimmer).

Have Questions?

What People Are Saying About Us

Dennis Bunch

I would just like to thank GSM Builders. My husband and I like our pool that has just been remodeled. While we thought we would have to build a new pool, Greg saved us on time and money. We added a spa and water features to our dated pool. It looks great! I would highly recommend Greg and his team. Great work!

Dean Miller

When my parents were deciding to move Florida, the first thing I thought of was "you'd better buy a house with a pool." They did, but it was in major need of repairs. We called Greg and his team and they helped us remodel the pool and the entire area around it! It's like their own personal tropical escape in their backyard. He was fast, friendly, and gave us a fair price! I highly recommend Greg for all of your pool remodeling needs!

Dustin S. Parrot

We hired Greg and his team at GSM Builders with recommendations from friends of ours. We made the right decisions with using GSM Builders to build our pool and backyard. With a few challenges to overcome, it came out great. I would Highly recommend these experts if you were to be building a new pool. The professionalism and expertise was top notch. Thank you for our wonderful backyard! We will be enjoying it for many years to come!

Jason Richards

We had gone to three different pool builders. One of them never came back with a quote. The other quoted us for a pool that was on the smaller side. GSM quoted us for a larger pool and showed us a computer rendition of what it would look ..

GSM Builders
2701 E. Oakland Park Blvd Suite A
Fort Lauderdale, FL 33306
954-605-4451
Email Us

Business Hours

Sunday : Closed

Monday : 8:00 am - 5:00 pm

Tuesday : 8:00 am - 5:00 pm

Wednesday : 8:00 am - 5:00 pm

Thursday : 8:00 am - 5:00 pm

Friday : 8:00 am - 5:00 pm

Saturday : 8:00 am - 1:00 pm

Website Links:

Home

Services

Photo Gallery

Service Area

About Us

News & Info

Get a Quote